N2 - The main challenge in scheduling multi-cluster tools in semiconductor manufacturing is the interactions among clusters. These interactions create a κ-unit optimal production that do not exist in single-cluster tools. This paper analyzes optimal scheduling of κ-unit cycle production of multi-cluster tools with single-blade robots. A resource-based method is used to analytically derive closed-form expressions for the minimal cycle time of a multi-cluster tool. Conditions for decoupling multi-cluster tools and optimality conditions for the widely used pull schedule are also presented. An example from industry production is used to illustrate the derived formula and decoupling conditions.
AB - The main challenge in scheduling multi-cluster tools in semiconductor manufacturing is the interactions among clusters. These interactions create a κ-unit optimal production that do not exist in single-cluster tools. This paper analyzes optimal scheduling of κ-unit cycle production of multi-cluster tools with single-blade robots. A resource-based method is used to analytically derive closed-form expressions for the minimal cycle time of a multi-cluster tool. Conditions for decoupling multi-cluster tools and optimality conditions for the widely used pull schedule are also presented. An example from industry production is used to illustrate the derived formula and decoupling conditions.
UR - http://www.scopus.com/inward/record.url?scp=54949096231&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=54949096231&partnerID=8YFLogxK
U2 - https://doi.org/10.1109/COASE.2008.4626439
DO - https://doi.org/10.1109/COASE.2008.4626439
M3 - Conference contribution
SN - 9781424420230
T3 - 4th IEEE Conference on Automation Science and Engineering, CASE 2008
SP - 335
EP - 340
BT - 4th IEEE Conference on Automation Science and Engineering, CASE 2008
T2 - 4th IEEE Conference on Automation Science and Engineering, CASE 2008
Y2 - 23 August 2008 through 26 August 2008
ER -